Solutions/Operations & Production Management/ERP – MES – SCADA Integration Layer
Data infrastructure & integration

ERP – MES – SCADA Integration Layer

An integration layer that sets up two-way, traceable data flow between ERP, MES and SCADA.

Usage context
Context
01
Narrative · 01

Context

An integration layer is installed when a defined, traceable data flow is needed between ERP, MES and SCADA.

Our approach
What we do
02
Narrative · 02

What we do

We map messages, master data and events between field and enterprise systems; authorization, logging and error records per flow are written in the project definition.

Deliverables
What you get
03
Narrative · 03

What you get

Running integration flows, traceable logs and acceptance-test records.

04

How we verify

Every integration flow is run end to end in acceptance testing; the logs show that sent and received messages match and that error and retry records are kept.

05

What is required

Requires test-environment access to the ERP, MES and SCADA systems, interface documentation and master-data mapping, and a shared test window with each system's owner.

How it works

When a defined data flow is set between ERP, MES and SCADA, transfer records and reconciliation stay on the same chain. The integration layer writes source and target fields in the project definition.

Invisible loss and latency

When a defined transfer runs between ERP, MES and SCADA, which records arrived and where delay occurred can be read from the record chain. Reconciliation follows the field mapping in the project definition.

Mapped messages and master data

Messages, master data and events are mapped between field and enterprise systems. Authorization, logging and error records per flow are written in the project definition; retries and failure states are tied to defined behaviour.

End-to-end acceptance

Every flow is run start to finish in acceptance testing; the logs show that sent and received messages match and errors are caught. The acceptance record is the basis for going live.

What comes next

Once the flows are stable, planning, traceability and reporting extend on the same integration layer.

Record chain

Record context

From obligation to measured record to produced output.

01
Obligation / requirement

Production, traceability or quality record obligation

02
Required record

Shop-floor production and process records

03
What AEON produces

Timestamped operational records from measurement

What's included

  • Plan-to-production reconciliation
  • Bidirectional order and feedback flow
  • Integration error rate dashboard
  • Two-way flow between ERP, MES and SCADA
Contact

Let’s clarify the scope together

We clarify a suitable scope together based on your site, industry and goals.