Virtual Commissioning

Validating PLC, robot and sensor behaviour in a virtual environment before a new line or machine is installed on site.

Usage context
Context
01
Narrative · 01

Context

Virtual commissioning is set up to try mechanical, electrical and software integration before the site. The same validation is used for automotive new-line investments, and for metal or white-goods line conversions.

Our approach
What we do
02
Narrative · 02

What we do

We build virtual commissioning simulation validating new line or machine before field installation. The project definition defines model scope, scenario set and acceptance criteria; PLC, robot and sensor behavior are tested in virtual environment. Field commissioning time is shortened.

Deliverables
What you get
03
Narrative · 03

What you get

Virtual commissioning report, pre-field defect list, commissioning time savings.

04

How we verify

Acceptance requires PLC, robot and sensor behaviour to be tested against the scenario set in the virtual environment, a pre-field defect list to be produced, and the reduction in field commissioning time to be recorded.

05

What is required

Requires the mechanical and electrical design data and PLC program of the line or machine, definitions of the model scope and scenario set, and approval of the acceptance criteria.

How it works

Without virtual commissioning, mechanical, electrical and software integration is tested on site and downtime cost is high. This simulation validates the new line before installation; acceptance depends on producing a pre-field defect list and shortening commissioning time.

Errors surfacing on site

When the new line is installed on site, integration errors are found there and commissioning stretches into weeks. Every fix is paid for with production downtime.

Validation in a virtual environment

The model scope, scenario set and acceptance criteria are defined in the project definition; PLC, robot and sensor behaviour are tested in the virtual environment. Errors are caught before they reach the field.

Shortened commissioning

Acceptance is by running the scenario set, producing a pre-field defect list and recording the commissioning-time saving.

What comes next

Once virtual commissioning is stable, the digital twin and automation regression extend on the same model.

Record chain

Record context

From obligation to measured record to produced output.

01
Obligation / requirement

Test, qualification or verification record requirement

02
Required record

Test and simulation result records

03
What AEON produces

Traceable test data and objective evaluation records

What's included

  • Virtual commissioning report
  • Pre-field defect list
  • Commissioning time savings