Solutions/Test, Simulation & Platforms/Process and Capacity Simulation
Simulation, modelling & training

Process and Capacity Simulation

Scenario comparison report, bottleneck map, capacity utilization projection.

Usage context
Context
01
Narrative · 01

Context

Process and capacity simulation is set up to model capacity and bottleneck scenarios on line, plant or logistics flows.

Our approach
What we do
02
Narrative · 02

What we do

We build capacity simulation modeling line, plant or logistics flow to compare investment scenarios. The project definition documents model inputs, assumptions and validation data; throughput, wait time and utilization are calculated per scenario. Results are compared numerically.

Deliverables
What you get
03
Narrative · 03

What you get

Scenario comparison report, bottleneck map, capacity utilization projection.

04

How we verify

Acceptance shows that the model reproduces a known period's actual throughput and utilization data within the defined accuracy. Scenarios are compared numerically on the same assumption set.

05

What is required

Requires the structure of the line, plant or logistics flow, the model inputs and assumptions, and actual production or flow data for validation.

Record chain

Record context

From obligation to measured record to produced output.

01
Obligation / requirement

Test, qualification or verification record requirement

02
Required record

Test and simulation result records

03
What AEON produces

Traceable test data and objective evaluation records

What's included

  • Scenario comparison report
  • Bottleneck map
  • Capacity utilization projection
  • Model inputs, assumptions and validation data written in the project definition
Contact

Let’s clarify the scope together

We clarify a suitable scope together based on your site, industry and goals.